{"id":226,"date":"2025-12-10T04:13:46","date_gmt":"2025-12-10T04:13:46","guid":{"rendered":"https:\/\/blanboz.com\/?p=226"},"modified":"2026-02-21T06:44:16","modified_gmt":"2026-02-21T06:44:16","slug":"uk-bess-grid-services-timelines-responsibilities-follow-up","status":"publish","type":"post","link":"https:\/\/blanboz.com\/es\/blog\/uk-bess-grid-services-timelines-responsibilities-follow-up\/","title":{"rendered":"UK BESS Grid Services - Timelines &amp; Responsabilidades (\u00a1Seguimiento!)"},"content":{"rendered":"<p>Tras el \u00e9xito de nuestro reciente art\u00edculo sobre UK BESS Grid Services (<a href=\"https:\/\/blanboz.com\/es\/blog\/uk-bess-grid-services\/\" title=\"\">https:\/\/blanboz.com\/blog\/uk-bess-grid-services<\/a>), que gener\u00f3 un gran inter\u00e9s y consultas, hemos recibido muchas preguntas sobre las medidas pr\u00e1cticas implicadas en el registro de los sistemas de almacenamiento de energ\u00eda en bater\u00edas (BESS) con los servicios del operador nacional del sistema el\u00e9ctrico (NESO). Para abordar este problema, compartimos nuestras ideas y experiencia para ayudar a los desarrolladores a navegar por el proceso y racionalizar sus proyectos BESS. Recomendamos leer esta publicaci\u00f3n y usar nuestro art\u00edculo anterior sobre Grid Services como un recurso complementario.<\/p>\n\n\n\n<p>Como se explic\u00f3 anteriormente en nuestro art\u00edculo Grid Services, BESS puede generar ingresos al participar en varios mercados de energ\u00eda y servicios de red del Reino Unido. Estos mercados var\u00edan en madurez, con algunos bien establecidos, otros siendo eliminados gradualmente, y otros nuevos emergiendo. Asesoramos a los clientes para que supervisen de cerca el desarrollo de la hoja de ruta esbozada por la NESO<a href=\"#_ftn1\" id=\"_ftnref1\">[1]<\/a><a href=\"https:\/\/www.nationalgrideso.com\/document\/278301\/download%5D\"><\/a>.<\/p>\n\n\n\n<p>Blanboz ha preparado los plazos previstos del proyecto y la divisi\u00f3n de responsabilidades para las tareas requeridas para los proyectos BESS (a medida de aquellos proyectos que se conectan directamente a la red de transporte de electricidad). Este art\u00edculo tiene como objetivo ayudar a los desarrolladores a comprender el proceso de prestaci\u00f3n de servicios de red para su proyecto BESS en el Reino Unido, centr\u00e1ndose en el cumplimiento y los requisitos de tiempo, as\u00ed como las responsabilidades de los desarrolladores y sus contratistas designados.<\/p>\n\n\n\n<p>Esta gu\u00eda de alto nivel se prepara sobre nuestra amplia experiencia en proyectos tanto en el Reino Unido como en proyectos globales de BESS, as\u00ed como en la orientaci\u00f3n de NESO. Se cubren los siguientes servicios de red:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Mecanismo de Equilibrio.<\/li>\n\n\n\n<li>Mercado al por mayor.<\/li>\n\n\n\n<li>Servicios de respuesta de frecuencia.<\/li>\n\n\n\n<li>Servicios de energ\u00eda reactiva.<\/li>\n\n\n\n<li>Servicios de restauraci\u00f3n.<\/li>\n\n\n\n<li>Mercado de capacidad.<\/li>\n<\/ul>\n\n\n\n<p>Para un apoyo personalizado en la navegaci\u00f3n de estas oportunidades en evoluci\u00f3n, le invitamos a ponerse en contacto con nuestro equipo. Ya sea que se encuentre en las primeras etapas de desarrollo de proyectos o busque optimizar un BESS operativo, ofrecemos orientaci\u00f3n personalizada para ayudarlo a liberar todo su potencial. Somos asesores t\u00e9cnicos especializados para todo lo relacionado con el BESS. Amplia experiencia trabajando en el Reino Unido y a nivel mundial en varias etapas de proyectos: viabilidad, desarrollo, preconstrucci\u00f3n, construcci\u00f3n, pruebas de aceptaci\u00f3n de f\u00e1brica, puesta en marcha, pruebas y operaciones.<\/p>\n\n\n\n<p>Nuestros expertos est\u00e1n disponibles para garantizar que su proyecto est\u00e9 estrat\u00e9gicamente posicionado para acceder y beneficiarse de todos los servicios de red disponibles, en alineaci\u00f3n con la \u00faltima hoja de ruta NESO y los desarrollos del mercado. Por favor, p\u00f3ngase en contacto con <strong>Harry Thomson en <a href=\"mailto:h.thomson@blanboz.com\">h.thomson@blanboz.com<\/a><\/strong> o <strong>Andr\u00e9s Blanco en <a href=\"mailto:a.blanco@blanboz.com\">a.blanco@blanboz.com<\/a><\/strong> para discutir c\u00f3mo podemos apoyar su proyecto.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><a href=\"#_ftnref1\" id=\"_ftn1\">[1]<\/a> <a href=\"https:\/\/www.neso.energy\/document\/358126\/download\">https:\/\/www.neso.energy\/document\/358126\/download<\/a><\/p>\n\n\n\n<p>El calendario de la ilustraci\u00f3n 1 ofrece una visi\u00f3n general de alto nivel de las actividades clave, los hitos y las tareas necesarias para que un proyecto BESS preste servicios de red NESO. La Figura 1 muestra un proyecto BESS que avanza desde el cierre financiero de sus contratos de suministro y construcci\u00f3n hasta la ingenier\u00eda de dise\u00f1o y puesta en marcha, y finalmente hasta las operaciones.<\/p>\n\n\n\n<p>El cronograma anticipado est\u00e1 estructurado para un proyecto BESS dirigido a operaciones comerciales a fines de 2028, suponiendo que haya un acuerdo de mercado de capacidad para el a\u00f1o de entrega 2029, que permita dos a\u00f1os desde el aviso para continuar.<\/p>\n\n\n\n<p>Si bien los proyectos m\u00e1s grandes requieren una construcci\u00f3n y puesta en marcha m\u00e1s prolongadas, el proceso para garantizar que el proyecto BESS pueda prestar servicios de red no debe variar significativamente. Este cronograma se prepar\u00f3 para proyectos de tama\u00f1o mediano a grande (150-500 MW); sin embargo, est\u00e1 sujeto a factores como la ubicaci\u00f3n, la complejidad de la configuraci\u00f3n del env\u00edo del proyecto y la experiencia del desarrollador y los contratistas implicados.<\/p>\n\n\n\n<p>Para mitigar el riesgo de retrasos que podr\u00edan posponer las operaciones e impactar la generaci\u00f3n de ingresos, se recomienda que los desarrolladores se pongan en contacto con NESO y Elexon lo antes posible. La participaci\u00f3n temprana permite identificar problemas no est\u00e1ndar, como la medici\u00f3n de la unidad de mecanismo de equilibrio m\u00faltiple (BMU) o el tama\u00f1o no tradicional de la BMU. Construye b\u00faferes de tiempo para un proceso de dise\u00f1o iterativo, lo que permite la entrada sin problemas en el mercado.<\/p>\n\n\n\n<p>La mayor\u00eda de los desarrolladores tendr\u00e1n que apoyarse en las partes interesadas de sus proyectos designados para dirigir o apoyar aspectos de las tareas para cumplir con los requisitos de NESO (m\u00e1s detalladas en la ilustraci\u00f3n 2). Las partes interesadas m\u00e1s cr\u00edticas son:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Proveedor de BESS.<\/li>\n\n\n\n<li>Contratista de Balanza de Plantas (BOP).<\/li>\n\n\n\n<li>Proveedor del operador del medidor (MOP) o proveedor autorizado del medidor.<\/li>\n\n\n\n<li>Proveedor de ruta al mercado (RTM).<\/li>\n\n\n\n<li>Y finalmente, Blanboz (\u00a1tu consultor t\u00e9cnico de confianza!).<\/li>\n<\/ul>\n\n\n\n<p>Es crucial para el \u00e9xito del proyecto que exista un enfoque coordinado para la ejecuci\u00f3n del proyecto entre todas las partes interesadas, especialmente cuando existen interfaces entre los \u00e1mbitos de trabajo o los equipos. Aqu\u00ed es donde se captura el valor de una evaluaci\u00f3n exhaustiva de la licitaci\u00f3n (Blanboz definitivamente puede desarrollar esto para usted), y la experiencia y la experiencia de los contratistas brillan.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"412\" src=\"https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revistas_BBZ-Expected-Timelines-1024x412.png\" alt=\"L\u00edneas de tiempo de BBZ\" class=\"wp-image-247\" srcset=\"https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revistas_BBZ-Expected-Timelines-1024x412.png 1024w, https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revistas_BBZ-Expected-Timelines-300x121.png 300w, https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revistas_BBZ-Expected-Timelines-768x309.png 768w, https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revistas_BBZ-Expected-Timelines-1536x618.png 1536w, https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revistas_BBZ-Expected-Timelines-2048x824.png 2048w, https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revistas_BBZ-Expected-Timelines-scaled.png 2560w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em><strong>Gr\u00e1fico 1: <\/strong>BBZ L\u00edneas de tiempo esperadas<\/em><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading has-text-color has-link-color wp-elements-19b48f463d233b1e53c4cec5925feab3\" style=\"color:#4a0c73\"><a>Divisi\u00f3n de Responsabilidad<\/a><\/h2>\n\n\n\n<p>El cuadro de divisi\u00f3n de responsabilidades (gr\u00e1fico 2) describe la asignaci\u00f3n prevista de tareas clave entre las partes interesadas del proyecto para permitir la prestaci\u00f3n de servicios de red NESO, garantizando una rendici\u00f3n de cuentas clara desde el dise\u00f1o hasta las operaciones. Cada servicio tiene requisitos distintos, incluido el registro con los \u00f3rganos rectores, el establecimiento de protocolos de comunicaci\u00f3n de despacho, la definici\u00f3n de procedimientos de prueba, la obtenci\u00f3n de la certificaci\u00f3n de Experto T\u00e9cnico Independiente (ITE), el desarrollo de modelos \/ estudios de proyectos y m\u00e1s.<\/p>\n\n\n\n<p>El desarrollador debe asegurarse de que las responsabilidades de estas tareas se reflejen en los contratos con las partes interesadas del proyecto, definiendo la responsabilidad de una sola parte y las obligaciones de interfaz. Blanboz recomienda que esto se refleje tanto en el contrato escrito (requisitos del empleador, especificaciones funcionales m\u00ednimas, etc.) como en una matriz de divisi\u00f3n de responsabilidades (por ejemplo, matriz RACI). El contrato es la herramienta del promotor para prevenir conflictos y hacer cumplir la titularidad de las responsabilidades una vez que el proyecto ha llegado al cierre financiero y los contratistas comienzan a entregar sus \u00e1mbitos de trabajo. Los riesgos a los que se enfrenta el desarrollador si no hay contratos herm\u00e9ticos incluyen retrasos en los hitos del proyecto y las operaciones comerciales, sanciones por incumplimiento o d\u00e9ficits en la generaci\u00f3n inicial de ingresos debido al incumplimiento de todos los requisitos de servicios de red previstos.<\/p>\n\n\n\n<p>Los requisitos de la tarea para entregar todos los servicios de red previstos se dividen t\u00edpicamente entre m\u00faltiples partes (como se mencion\u00f3 anteriormente), con una sola parte responsable del \u00e9xito de la tarea. Esto se muestra en la Figura 2 con el partido principal declarado, seguido por los partidos de apoyo (SF).<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"412\" src=\"https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revista_2-1024x412.jpg\" alt=\"Grid Services - Divisi\u00f3n de Responsabilidades \" class=\"wp-image-242\" srcset=\"https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revista_2-1024x412.jpg 1024w, https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revista_2-300x121.jpg 300w, https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revista_2-768x309.jpg 768w, https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revista_2-1536x618.jpg 1536w, https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revista_2-2048x824.jpg 2048w, https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Revista_2-scaled.jpg 2560w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em><strong>Gr\u00e1fico 2:<\/strong> Divisi\u00f3n de Responsabilidad para Tareas de Cumplimiento de Servicios Clave Grid<\/em><\/figcaption><\/figure>\n\n\n\n<p>En resumen, esta gu\u00eda describe el cronograma anticipado del proyecto BESS para permitir la finalizaci\u00f3n exitosa del cumplimiento del servicio de red y las operaciones comerciales. El cronograma destaca la necesidad de una planificaci\u00f3n y organizaci\u00f3n proactivas para administrar m\u00faltiples actividades simult\u00e1neamente. La prevenci\u00f3n de retrasos requiere una coordinaci\u00f3n temprana entre las partes interesadas para fomentar el trabajo en equipo colaborativo. Esto lleva a la Divisi\u00f3n de Responsabilidad, que destaca c\u00f3mo los contratos deben definir la propiedad y el apoyo para las tareas necesarias para lograr el cumplimiento de NESO. El cumplimiento del servicio de red es un proceso complejo y exige una organizaci\u00f3n s\u00f3lida para navegar por los organismos reguladores, protocolos y protocolos de prueba.<\/p>\n\n\n\n<p>En conclusi\u00f3n, todo este proceso comienza mucho antes en el desarrollo de un proyecto. Supongamos que los fundamentos de un proyecto son d\u00e9biles, como contratos no aptos y \/ o no ejecutables, contratistas inexpertos e inexpertos nombrados, condiciones de planificaci\u00f3n inalcanzables emitidas, despacho inapropiado y filosof\u00eda de comunicaci\u00f3n, o una falta de protecci\u00f3n comercial para los desarrolladores si los aspectos salen mal. En ese caso, es mucho m\u00e1s dif\u00edcil de rectificar m\u00e1s tarde (con largos retrasos o costos adicionales). Recomendamos encarecidamente que los desarrolladores busquen orientaci\u00f3n experta desde el principio para impulsar el \u00e9xito del proyecto y lograr los rendimientos financieros previstos, y no hay nadie mejor que Blanboz. <strong>\u00a1Piensa en BESS, piensa en Blanboz!<\/strong>. En Blanboz, entendemos los desaf\u00edos \u00fanicos que conlleva la gesti\u00f3n de la complejidad t\u00e9cnica de los proyectos BESS durante las fases de desarrollo, construcci\u00f3n y operaci\u00f3n. Nuestro historial habla por s\u00ed solo, y hemos encabezado algunos de los primeros proyectos BESS del Reino Unido, incluidas importantes iniciativas relacionadas con la distribuci\u00f3n y la transmisi\u00f3n que superan los 500 MW\/1 GWh por proyecto, con un total de m\u00e1s de 12 GWh en todo el mundo. &nbsp;<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"has-text-color has-link-color wp-elements-4289f489d4044cfb0953b46727d5efb3\" style=\"color:#4a0c73\"><a>Acerca de los autores<\/a><\/p>\n\n\n\n<div class=\"wp-block-group is-nowrap is-layout-flex wp-container-core-group-is-layout-ad2f72ca wp-block-group-is-layout-flex\">\n<figure class=\"wp-block-image size-full wp-container-content-82ea18c2\"><img loading=\"lazy\" decoding=\"async\" width=\"53\" height=\"53\" src=\"https:\/\/blanboz.com\/wp-content\/uploads\/2025\/12\/Hth.png\" alt=\"Hth\" class=\"wp-image-231\"\/><\/figure>\n\n\n\n<p>Harry Thomson BEng AMIMechE<strong> - Consultor del Proyecto BESS<\/strong><\/p>\n<\/div>\n\n\n\n<p>Consultor de proyectos con m\u00e1s de dos a\u00f1os de experiencia en el sector de las energ\u00edas renovables, especializado en BESS. Tras graduarme en 2023 e interesarme por el almacenamiento de energ\u00eda despu\u00e9s de escribir mi proyecto de honores \u00abUna investigaci\u00f3n sobre las futuras redes el\u00e9ctricas y el papel cada vez m\u00e1s importante del almacenamiento de energ\u00eda\u00bb, he estado trabajando como consultora en una capacidad de ingeniero de BESS y asistente de gestor de proyectos para desarrolladores y prestamistas. Durante este tiempo, he colaborado estrechamente con los equipos de clientes para asegurar con \u00e9xito la firma de m\u00e1s de 4,1 GWh de acuerdos de suministro de BESS, impulsando la entrega del proyecto a trav\u00e9s de la orientaci\u00f3n t\u00e9cnica y comercial. Mi experiencia incluye las primeras etapas del desarrollo del proyecto, incluida la preparaci\u00f3n de dibujos t\u00e9cnicos e informes para las presentaciones de DCO para desarrollos h\u00edbridos.<\/p>\n\n\n\n<ul class=\"wp-block-social-links is-layout-flex wp-block-social-links-is-layout-flex\"><li class=\"wp-social-link wp-social-link-linkedin  wp-block-social-link\"><a href=\"http:\/\/www.linkedin.com\/in\/harrythomson01\" class=\"wp-block-social-link-anchor\"><svg width=\"24\" height=\"24\" viewbox=\"0 0 24 24\" version=\"1.1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\"><path d=\"M19.7,3H4.3C3.582,3,3,3.582,3,4.3v15.4C3,20.418,3.582,21,4.3,21h15.4c0.718,0,1.3-0.582,1.3-1.3V4.3 C21,3.582,20.418,3,19.7,3z M8.339,18.338H5.667v-8.59h2.672V18.338z M7.004,8.574c-0.857,0-1.549-0.694-1.549-1.548 c0-0.855,0.691-1.548,1.549-1.548c0.854,0,1.547,0.694,1.547,1.548C8.551,7.881,7.858,8.574,7.004,8.574z M18.339,18.338h-2.669 v-4.177c0-0.996-0.017-2.278-1.387-2.278c-1.389,0-1.601,1.086-1.601,2.206v4.249h-2.667v-8.59h2.559v1.174h0.037 c0.356-0.675,1.227-1.387,2.526-1.387c2.703,0,3.203,1.779,3.203,4.092V18.338z\"><\/path><\/svg><span class=\"wp-block-social-link-label screen-reader-text\">LinkedIn<\/span><\/a><\/li><\/ul>\n\n\n\n<div class=\"wp-block-group is-nowrap is-layout-flex wp-container-core-group-is-layout-ad2f72ca wp-block-group-is-layout-flex\">\n<figure class=\"wp-block-image size-large wp-container-content-82ea18c2\"><a href=\"https:\/\/blanboz.com\/wp-content\/uploads\/2026\/02\/Main-Photo_ABL_2026.png\"><img decoding=\"async\" src=\"https:\/\/blanboz.com\/wp-content\/uploads\/2026\/02\/Main-Photo_ABL_2026.png\" alt=\"Abl\" style=\"object-fit:cover\"\/><\/a><\/figure>\n\n\n\n<p>Andr\u00e9s Blanco MEng MSc CEng MIET <strong>\u2013 Consultor del proyecto BESS I Director Gerente<\/strong><\/p>\n<\/div>\n\n\n\n<p>Con m\u00e1s de 15 a\u00f1os de experiencia en la industria de las energ\u00edas renovables, soy un ingeniero cualificado en el Reino Unido. Durante los \u00faltimos diez a\u00f1os, me he especializado en el sector BESS, un autoproclamado BESS Master. Como l\u00edder t\u00e9cnico, he supervisado la ejecuci\u00f3n exitosa de proyectos por valor de 12 GWh de BESS y 7,5 GWp de energ\u00eda solar fotovoltaica a nivel mundial. Experiencia con la mayor\u00eda de fabricantes de c\u00e9lulas e integradores de BESS en el mercado. Experto t\u00e9cnico con s\u00f3lidos conocimientos desde el dise\u00f1o y desarrollo temprano hasta la implementaci\u00f3n de proyectos, construcci\u00f3n y puesta en marcha de proyectos BESS. Altamente capaz en integraci\u00f3n comercial y adquisici\u00f3n, brindando servicios de asesoramiento en revisiones t\u00e9cnicas, cumplimiento con diferentes mercados de energ\u00eda y servicios de red en toda la regi\u00f3n del Reino Unido y EMEA.<\/p>\n\n\n\n<ul class=\"wp-block-social-links is-layout-flex wp-block-social-links-is-layout-flex\"><li class=\"wp-social-link wp-social-link-linkedin  wp-block-social-link\"><a href=\"https:\/\/www.linkedin.com\/in\/andresblanco77%20\" class=\"wp-block-social-link-anchor\"><svg width=\"24\" height=\"24\" viewbox=\"0 0 24 24\" version=\"1.1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\"><path d=\"M19.7,3H4.3C3.582,3,3,3.582,3,4.3v15.4C3,20.418,3.582,21,4.3,21h15.4c0.718,0,1.3-0.582,1.3-1.3V4.3 C21,3.582,20.418,3,19.7,3z M8.339,18.338H5.667v-8.59h2.672V18.338z M7.004,8.574c-0.857,0-1.549-0.694-1.549-1.548 c0-0.855,0.691-1.548,1.549-1.548c0.854,0,1.547,0.694,1.547,1.548C8.551,7.881,7.858,8.574,7.004,8.574z M18.339,18.338h-2.669 v-4.177c0-0.996-0.017-2.278-1.387-2.278c-1.389,0-1.601,1.086-1.601,2.206v4.249h-2.667v-8.59h2.559v1.174h0.037 c0.356-0.675,1.227-1.387,2.526-1.387c2.703,0,3.203,1.779,3.203,4.092V18.338z\"><\/path><\/svg><span class=\"wp-block-social-link-label screen-reader-text\">LinkedIn<\/span><\/a><\/li><\/ul>","protected":false},"excerpt":{"rendered":"<p>Tras el \u00e9xito de nuestro reciente art\u00edculo sobre los servicios de red BESS del Reino Unido, que gener\u00f3 un gran inter\u00e9s y consultas, hemos recibido muchas preguntas sobre las medidas pr\u00e1cticas que implica el registro de los sistemas de almacenamiento de energ\u00eda mediante bater\u00edas (BESS) con los servicios del operador nacional de sistemas el\u00e9ctricos (NESO).<\/p>","protected":false},"author":2,"featured_media":247,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"slim_seo":{"title":"UK BESS Grid Services - Timelines &amp; Responsibilities (Follow Up!) - Blanboz","description":"Following the success of our recent article on UK BESS Grid Services, which generated significant interest and enquiries, we\u2019ve received many questions about th"},"footnotes":""},"categories":[3],"tags":[6,5,9,10,11,14,15,7],"class_list":["post-226","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-battery-energy-storage-system","tag-bess","tag-blanboz","tag-blanboz-limited","tag-energy-storage","tag-grid-services","tag-neso","tag-uk"],"meta_box":[],"_links":{"self":[{"href":"https:\/\/blanboz.com\/es\/wp-json\/wp\/v2\/posts\/226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blanboz.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blanboz.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blanboz.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/blanboz.com\/es\/wp-json\/wp\/v2\/comments?post=226"}],"version-history":[{"count":19,"href":"https:\/\/blanboz.com\/es\/wp-json\/wp\/v2\/posts\/226\/revisions"}],"predecessor-version":[{"id":273,"href":"https:\/\/blanboz.com\/es\/wp-json\/wp\/v2\/posts\/226\/revisions\/273"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blanboz.com\/es\/wp-json\/wp\/v2\/media\/247"}],"wp:attachment":[{"href":"https:\/\/blanboz.com\/es\/wp-json\/wp\/v2\/media?parent=226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blanboz.com\/es\/wp-json\/wp\/v2\/categories?post=226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blanboz.com\/es\/wp-json\/wp\/v2\/tags?post=226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}